Título

Delivery and integration of MEGARA at GTC: the process of going from laboratory to the telescope

AutorPérez-Calpena, Ana; García-Vargas, Marísa-Luisa Luisa; Gil de Paz, Armando; Castillo Morales, África; Martínez Delgado, Ismael; Maldonado, Manuel CSIC ORCID ; Sánchez-Blanco Mancera, Ernesto; Sánchez, Ainhoa; Verdet, Antonio; Lefort, Bertrand; Pascual, Sergio; Curto, Andrés CSIC; García, Oscar; Arrillaga, Xabier; Carrera, Ignacio; Gonzalez, Eider; Gallego, Jesús; Carrasco Licea, Esperanza; Iglesias-Páramo, J. CSIC ORCID; Cedazo, Raquel
Palabras claveMEGARA
GTC
Integral field unit (IFU)
Multi-object spectrograph (MOS)
Fiber bundles
Packing
Delivery
Integration
Verification
Fecha de publicación2018
EditorInternational Society for Optical Engineering
CitaciónProceedings of SPIE 10705: 107050A (2018)
ResumenMEGARA is an IFU & MOS medium-resolution spectrograph that finished its commissioning at the GTC 10m telescope on August 2017. MEGARA is a fiber-fed high-resolution spectrograph with two major units, Fiber-MOS & Spectrograph, that are now located at the Folded-Cass F and Nasmyth-A foci of GTC respectively. These are linked by more than 1200 fibers 44.5m-length split between two observing modes, the LCB (Integral Field Unit, IFU) and a Multi-Object (MOS) capability with 92 robotic positioners each one provided with a mini-bundle of 7 fibers. The spectrograph can accommodate 18 VPHs (11 of them can be simultaneously mounted) covering the visible wavelength range at Resolving Powers between R=6000-20000. This paper presents the sequence of tasks carried out after Laboratory Acceptance at the Universidad Complutense de Madrid to move the whole instrument to the GTC. A detailed day-to-day plan was followed to disassemble, pack, transport, reintegrate the full instrument at the GTC and to verify performance to ensure the instrument was ready for commissioning. The lessons learnt are relevant to other double-focus instruments being developed such as WEAVE@WHT or PFS@Subaru. © 2018 SPIE.
Versión del editorhttp://dx.doi.org/10.1117/12.2311903
URIhttp://hdl.handle.net/10261/215526
DOI10.1117/12.2311903
Identificadoresdoi: 10.1117/12.2311903
issn: 0277-786X
isbn: 978-1-5106-1964-7
Aparece en las colecciones: (IAA) Artículos

Ficheros en este ítem:
Fichero Descripción Tamaño Formato
IAA_2018SPIE10705E..0AP.pdf3,16 MBAdobe PDFVista previa
Visualizar/Abrir
Mostrar el registro completo

CORE Recommender

Page view(s)

132
checked on 24-abr-2024

Download(s)

193
checked on 24-abr-2024

Google ScholarTM

Check

Altmetric

Altmetric


NOTA: Los ítems de Digital.CSIC están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.