Por favor, use este identificador para citar o enlazar a este item: http://hdl.handle.net/10261/185199
COMPARTIR / EXPORTAR:
logo share SHARE logo core CORE BASE
Visualizar otros formatos: MARC | Dublin Core | RDF | ORE | MODS | METS | DIDL | DATACITE

Invitar a revisión por pares abierta
Título

Acorn: Developing full-chain industrial carbon capture and storage in a resource- and infrastructure-rich hydrocarbon province

AutorAlcalde, Juan CSIC ORCID ; Heinemann, N.; Mabon, L.; Worden, R. H.; de Coninck, H.; Robertson, H.; Maver, M.; Ghanbari, S.; Swennenhuis, F.; Mann, I.; Walker, T.; Gomersal, S.; Bond, Clare E.; Allen, M.J.; Haszeldine, R. Stuart; James, A.; Mackay, E.J.; Brownsort, P. A.; Faulkner, D. R.; Murphy, S.
Palabras claveCarbon capture and storage
Cost-reduction
Full-chain CCS
Infrastructure re-use
Just transition
Stakeholder engagement
Fecha de publicaciónjun-2019
EditorElsevier
CitaciónJournal of Cleaner Production, 233: 963-971 (2019)
ResumenResearch to date has identified cost and lack of support from stakeholders as two key barriers to the development of a carbon dioxide capture and storage (CCS) industry that is capable of effectively mitigating climate change. This paper responds to these challenges through systematic evaluation of the research and development process for the Acorn CCS project, a project designed to develop a scalable, full-chain CCS project on the north-east coast of the UK. Through assessment of Acorn's publicly-available outputs, we identify strategies which may help to enhance the viability of early-stage CCS projects. Initial capital costs can be minimised by infrastructure re-use, particularly pipelines, and by re-use of data describing the subsurface acquired during oil and gas exploration activity. Also, development of the project in separate stages of activity (e.g. different phases of infrastructure re-use and investment into new infrastructure) enables cost reduction for future build-out phases. Additionally, engagement of regional-level policy makers may help to build stakeholder support by situating CCS within regional decarbonisation narratives. We argue that these insights may be translated to general objectives for any CCS project sharing similar characteristics such as legacy infrastructure, industrial clusters and an involved stakeholder-base that is engaged with the fossil fuel industry. © 2019
Versión del editorhttps://doi.org/10.1016/j.jclepro.2019.06.087
URIhttp://hdl.handle.net/10261/185199
DOI10.1016/j.jclepro.2019.06.087
ISSN0959-6526
E-ISSN1879-1786
Aparece en las colecciones: (Geo3Bcn) Artículos




Ficheros en este ítem:
Fichero Descripción Tamaño Formato
Alcalde_Journal_of_Cleaner_Production_233_963.pdf813,47 kBAdobe PDFVista previa
Visualizar/Abrir
Mostrar el registro completo

CORE Recommender

SCOPUSTM   
Citations

63
checked on 20-abr-2024

WEB OF SCIENCETM
Citations

50
checked on 17-feb-2024

Page view(s)

366
checked on 22-abr-2024

Download(s)

237
checked on 22-abr-2024

Google ScholarTM

Check

Altmetric

Altmetric


Este item está licenciado bajo una Licencia Creative Commons Creative Commons